Utility companies continued moving facilities in conflict with the proposed improvements this past week. Nicor Gas crews welded steel pipe sections in preparation for installation on the east side of Quentin Road. Four inch gas pipe was installed under Quentin Road at several locations which distribute natural gas to homes and businesses. AT&T continued hanging new aerial cable and installing underground ducts throughout the job limits. The roadway contractor installed erosion barrier in preparation for temporary pavement which is anticipated to begin soon. The temporary pavement is needed to maintain the number of lanes and capacity which currently exists.

Please check the Photos tab for more in-depth information regarding the project.