Update – 3/12/2019

The contractor continued preparation work on two ground improvement areas on the east side of Quentin Road between East and West Cuba Roads.  This week excavation work to install a temporary sanitary sewer bypass system around the ground improvement areas will begin. Temporary concrete barrier walls were installed on the project site this past week.  Work will continue this week drilling and pinning these walls to the existing pavement.

Nicor Gas crews continued installing new valves at Boschome Drive and Quentin Road, along with a series of valves across from Bristol Trail.  This week Nicor crews plan to install the 4” distribution system in the area of Lea Lane, Greenwood Drive and Bristol Trail.  This work is anticipated to be complete the week of March 25.

AT&T crews continue pulling new cables in conduits and splicing aerial cables at various locations throughout the project.  Splicing on both the fiber optic and copper cables is expected to be complete in April.  The old cables are scheduled to be taken out of service April 18th through April 22nd.

Please check the Photos tab for more in-depth information regarding the project.