Update – 07/27/2020

Concrete sidewalk placement on the west side of Quentin Road started this past week. The sidewalk will extend from just north of Pine Lake Circle to just south of Illinois Route 22. The sidewalk is placed on a 4” aggregate base. Placement of the sidewalk is anticipated to continue through the end of the week.

 

Noise abatement wall construction continued last week.  Crews installed columns, panels, and decorative caps at multiple locations and power washed the walls.  The noise walls are near complete with the exception of a section south of Bristol Trail Road.  This location will be built once the utility company relocates the power lines in conflict.

 

Other project work over the last couple of weeks included completion of the retaining wall north of Lea Lane and installation of traffic signal wiring.  Work anticipated over the next couple of weeks includes installation of the new traffic signal posts and mast arms.  Traffic will be placed into a new traffic pattern on Wednesday, July 29th.  The northbound and southbound lanes will be jogged to the outside lane of the new roadway.  This will allow for the removal of temporary pavement and placement of median curb and permanent pavement.   Please continue to use caution when driving through the work zone.

 

Please check the Photos tab for more in-depth information regarding the project.