PH_CH_AggAtRetWallNofPineLake-03_03232020
Aggregate is placed and compacted at the retaining wall north of Pine Lake Circle. The aggregate is wetted to achieve the optimum moisture content for compaction. (03/23/2020)
Aggregate is placed and compacted at the retaining wall north of Pine Lake Circle. The aggregate is wetted to achieve the optimum moisture content for compaction. (03/23/2020)