PH_CH_RetWallNofGreenwoodDr-03_08052019
Installation of a block retaining wall started north of Greenwood Drive. When finished the wall will be 450 feet long and topped with an ornamental fence. (8/5/2019)
Installation of a block retaining wall started north of Greenwood Drive. When finished the wall will be 450 feet long and topped with an ornamental fence. (8/5/2019)