PH_CH_TempSheetPiles-02_04222019

Temporary metal sheet piles are installed north of Greenwood Drive. A second line of sheets will be installed later this week approximately 45 feet west after portions of the existing pavement is removed. The sheets will act as a temporary retaining wall. Soft, poor soils between the sheet walls will be removed and replaced by materials suitable for roadway construction. (4/22/2019)