PH_CH_TopsoilStripping-01_05012019
Topsoil stripping south of East Cuba Road. The topsoil will be respread when embankment and roadway construction is complete. (4/30/2019)
Topsoil stripping south of East Cuba Road. The topsoil will be respread when embankment and roadway construction is complete. (4/30/2019)