A sending pit is excavated south of East Cuba Road to install pipe by directional boring. Pipe will be lowered into place by the crane and welded. After the field welds are inspected and certified, the pipe is augered into place towards the receiving pit. Installing pipe in this manner prevents the surface from being disturbed. (10/08/18)