Sections of casing pipe, with an inside diameter slightly larger than the outside diameter of the 20” steel pipe, are welded together in boring pits. The casing pipes are then pushed under Quentin Road and new gas pipe will be inserted in them. Doing so avoids having to trench the pipe across the roadway which is less disruptive to traffic. (09/24/18)